This project required an expanded floor plan to accommodate a new fully accessible roll in shower area, and accessible upgrades to the existing fixture areas. Multiple fixtures were carefully coordinated with niches and grab bars and placed to allow a high level of personal control, while providing ample area to function.

Tile Design: M. Rheubottom Interior Design

Edited-Lake-before 1.jpg

Before

Edited-Lake-IMG_0957.jpg

After